Details from public sources: terms, prices and availability are confirmed with the developer.
SwieqiAzure Heights
Swieqi, Malta
Data as of 18 October 2026Availability to be confirmedUnder construction
- Type
- Apartments, penthouses
- Stage
- Under construction
- Handover
- December 2027
- Bedrooms
- 1-2
- Area
- 61-159 m²
- Homes
- 12
- Data as of
- 18 October 2026
- Property ID
- BE-10105
About the property
A building of 12 apartments and maisonettes (1-2 bedrooms, 61-159 m2) in Swieqi by LJ Projects. Completion is stated for December 2027; two units remained as of October 2026. Price from EUR 330,000 with staged payments tied to construction.
Features per the developer
- Two top-floor 2-bedroom penthouses (111 and 135 m2) with private rooftop pools, currently on hold
Units and offers
Prices, areas and floors are from the developer price list. Areas may vary by up to 3%. We confirm the availability and price of a unit before reservation.
Payments and costs
Purchase taxes and costs are in the calculation below. This is a preliminary guide: the notary or lawyer confirms the exact amounts before the deal.
Purchase, mortgage and rental calculation
The calculation uses the price of the most affordable unit. Cost rates are a guide for the country and can be changed.
Buyer costs are usually 5-10% on top of the price and depend on the country. Enter your rates or send the calculation to a specialist.
- Purchase costs, estimate
- ≈ 0% · €0
- Preliminary total
- €330,000
This total is preliminary: the tax regime of the deal (transfer tax or VAT) and any fees are confirmed from the documents before reservation.
Price and risk analysis
Price per m² of this offer next to BRIDGES Estate catalog properties, price history and deal risks. Catalog properties differ in size, stage and price terms, so the comparison is a guide, not a market valuation.
Price history
| Date | Event | Price from |
|---|---|---|
| 18 October 2026 | Price in the catalog | €330,000 |
The history grows with every seller price list update.
Housing market: Malta
- 1 year
- +6.7%
- 5 years
- +38.1%
- 10 years
- +80.2%
- Latest data
- Q1 2026
2026 Q1
National house price index, Bank for International Settlements (BIS). In local currency, not adjusted for inflation. Past market dynamics, not a forecast or a valuation of this property.
Deal risks
- Off-plan purchase: handover planned by the developer for December 2027. We check delays and the payment schedule in the contract.
- Not in the developer materials: exact coordinates, vat status. We will confirm before reservation.
Analysis based on BRIDGES Estate catalog data as of the price list date. It is not a forecast or a promise of income.
Location
- District
- Ibragg
- City
- Swieqi
- Country
- Malta
Loading the map
Point accuracy: district centre, not the address · Wikipedia/OSM: Swieqi locality centroid (approximate)
Nearby
We publish travel times and distances to the airport, schools and shops only with a method and a source. They have not been checked for this property yet; a specialist will prepare routes on request.
Sources and checks
The details on this page come from the developer materials. A lawyer carries out the legal check of the property and documents before the contract is signed.
- Developer website data
- 18 October 2026
- Azure Heights - застройщика · 18 October 2026 · general details
- застройщика developments index · 18 October 2026 · stage and dates
Missing from the source: exact coordinates, vat status
Why it is not published: нет разрешения на фото и материалы; нет договора или согласия застройщика на размещение; данные не сверены ответственным по рынку
Developer
The developer is LJ Projects, according to the developer website. BRIDGES Estate handles the sale and is not the developer.
We will request and check the developer registration details, the building permit and the land title before reservation.
New-build standard: Malta
General standards for new homes in the country, not the specifications of this building. We confirm this building's class, materials and warranties with the developer before reservation.
- Structure
- Limestone or concrete block walls with reinforced concrete slabs. Seismic risk is low.
- Energy class
- Since 2021 all new homes in the EU are built to the nearly zero-energy standard (nZEB). An energy certificate is required for every sale.
- Building systems
- Inverter air conditioning for heating and cooling, double glazing, rooftop solar panels, underground garages.
- Buyer protection
- The promise of sale is registered with the tax authority and a notary completes the deal.
Book a viewing

Similar projects
All projects in the country
Azure Villas
Villas and houses · Off-plan
- Units
- 8
- Beds
- no data
- Handover
- TBC




Apartments and offices in central Limassol
Apartments, studios · Under construction
- Area
- no data
- Beds
- 0-3
- Handover
- TBC

Apartments and villas by the beach in Geroskipou
Apartments, villas and houses · Off-plan
- Units
- 16
- Beds
- 2-4
- Handover
- TBC

Apartments and villas in the pine forest of the Troodos mountains
Apartments, villas and houses · Off-plan
- Units
- 18
- Beds
- 1-3
- Handover
- TBC

Apartments and villas near golf resorts in Asomatos
Apartments, villas and houses, studios · Off-plan
- Units
- 77
- Beds
- 0-2
- Handover
- TBC